Jan 08 -Objection to Maroota sandming unlicensed water use, failure to rehabilitate etc for 20 years

trigresbatterview12jan08.jpg

 

 

 

Date: 31st January 2008-01-27,

by email and by hand

 

 

 

To:       NSW Department of Planning, Major Projects (DOP)

            Ground Floor, 23-33 Bridge St Sydney NSW 2000

 

            Baulkham Hills Shire Council

            Showground Rd Castle Hill

 

 

Attn:     Director General DOP

            General Manager, BHSC

            Stuart Bates, Investigation Officer BHSC

 

 

 

 

 

 

Dear Sir

 

 

Submission by Neville Diamond and Thomas McLoughlin jointly and severally re

1. Objection to the development application (DA) in Environmental Assessment (EA) lodged by John Graham (JG) for PF Formation (PF) Project Application No.06-0104 dated 3/12/07 for the Trig Hill Area ("THA")

 

2. Formal complaint to Baulkham Hills Shire Council (BHSC) lapsed consent Trig Hill sand mine re lack of compliance with water licensing consent conditions 1998 prior to commencement of works, lack of progressive rehabilitation, other problems

 

 

Please note this submission is internet format based with embedded links and colour photographs posted to the web at  community media www.sydneyalternativemedia.com (currently at 19,000 page views per month):

 

Jan 08 - Objection to Maroota sandming unlicensed water use, failure to rehabilitate etc for 20 years

 

This submission is by Thomas McLoughlin as editor of www.sydneyalternativemedia.com, principal of ecology action Australia (unincorporated), and a solicitor in NSW, in his own capacity.

 

It is also a submission jointly and severally for Neville Diamond by Tom McLoughlin as his solicitor on a strictly pro bono basis in the public interest regarding ecological sustainability and due process.

 

Neither Tom McLoughlin, nor any organisation he has worked for, or been a member of, has ever received any financial or in kind benefit or promise of benefit in a financial sense, in relation to sand mining at Maroota or anywhere, or in relation to Neville Diamond (except to say trivial secretarial disbursements of tens of dollars). This statement is made as a legal practitioner in NSW and applies for all of the 1990ies to the present time.

 

It is a submission in good faith in the public interest.

 

 

Introduction

 

We submit this DA is highly excessive for targeting sensitive bushland area to access low quality high clay content sand, destroying a scenic lookout on public land, badly damaging local water resources in the process. At the very least we urge the Minister to refer the DA to Dr Merrick who has been assessing the Somersby sand mining DA which is open to him under Part 3A. In this respect we provide expert evidence in reports by ERM McCotter, and Sullivan, below corroborating the hugely excessive use of water by PF Formation/Graham.

 

We also note that the EA will need to be re advertised due to misleading divergence of the EA Summary on the DOP website compared to the CD and printed version copy in the EA itself for about 2 months from Dec 07 to Jan 08.

 

Political/legal context

 

Regretably this DA is another exemplar of:

 

Strong-arm tacticians Elisabeth Wynhausen in  The Australian 26th Jan. 2008

 

in relation to ramming through ‘major developments’ against community standards and ecological sustainability.

 

In particular this quote:

 

"The minister [Sartor] can declare a site to be "state-significant", giving developers the go-ahead on big projects. Under Part 3A of the Environmental Planning and Assessment Act, projects that are objectively of state significance can go to the minister. Brad Hazard, the Opposition's planning spokesman, says of the Government's planning actions: "The reality is that anything Frank wants to get his hands on to, he takes."

strongarmtacticiansaust26jan08p27.jpg

 

This theme regarding the dictatorial and/or arbitrary use of Part 3A of the EPAA reversing the proud history of the NSW ALP in Government from the intent and effect of the 1979 Act has been picked up extensively by civil society as here:

1. NSW Nature Conservation Council background paper at Major Projects (Part 3A) developments,

“Lack of transparency
The concentration of power in one person, the Minister for Planning, is bad enough, with clear implications for corruption. To make this worse, the decision-making process surrounding Part 3A developments is unclear, with environmental impacts, submissions from community groups and the public, and the thoughts of other government departments merely needing to be 'considered' by Frank Sartor.”

Weakening of other laws
Under Part 3A, many standard approvals are not required, meaning effectively the Minister for Planning becomes the consent authority for these actions. Approvals that are no longer required include: ….

- Clearing native vegetation or state protected land (under Native Vegetation Act )

- Permit to excavate from riverbanks or shore, or to interrupt the water flow (under Rivers and Foreshores Improvement Act) ….

- Water use approvals, water supply, drainage and flood control works, controlled activities and aquifer interference (under Water Management Act) …

- Excavation permits, required for any likely impacts on relics (European heritage) under the Heritage Act ….

 

Part 3A also changed the National Parks and Wildlife Act so that developers will not be prosecuted for harming protected fauna without a licence, if the work carried out is essential for Part 3A projects. ….

 

What about environmental impact assessment?

For Major Projects, the Director General determines the Requirements for environmental assessment. The Director General then writes a report to the Minister for Planning, including a statement whether the developer's environmental assessment met the Requirements. The Minister must 'take into account' this statement when deciding whether to approve the development. However, amendments made in 2006 – controversially described as ‘housekeeping’ measures by Frank Sartor – mean the Minister can now approve a development application under Part 3A whether or not the environmental assessment complies with the Director General’s environmental assessment requirements.

For Part 3A projects, environmental assessment requirements are ‘tailored’ to a particular project. This means that the Director-General determines the assessment requirements based on consultations with ‘relevant’ (as decided by the Director General himself) public authorities. Consequently, if the Director General misses something (e.g. air pollution impacts) when writing the Environmental Assessment Requirements, then such impacts do not need to be investigated by the developer.

The peak green groups Media Release from when Part 3A was introduced reads:

Law removing community's right to appeal massive development passes

 

Friday, 10 June 2005

Environment groups are outraged that NSW Parliament last night approved a Bill which makes major and alarming changes to environmental laws in NSW. Both major parties pandered to the development industry, but set dozens of community groups against them, they said.

"The passage of this appalling piece of legislation represents the greatest set-back in environmental protection laws in over 25 years. On his tenth anniversary as Premier, this Bill will ensure that Bob Carr is remembered as the 'anything but green' Premier," said Cate Faehrmann, director of the Nature Conservation Council of NSW.

"The Bill gives the Minister for Infrastructure, Planning and Natural Resources largely unchecked powers when assessing the most significant and potentially environmentally damaging projects.

"The Government was hard-pressed to even demonstrate the need for granting such broad, discretionary powers to the Minister. The best example they could come up with to justify this dangerous piece of legislation in Parliament was a bridge collapse over the Derwent River in Tasmania - which occurred decades ago," said Ms Faehrmann.

"The Bill is so flawed that even the Coalition saw fit to propose amendments which would have provided at least some checks and balances limiting the Minister's broad discretion.

"But Coalition concerns over the Bill in the end amounted to mere rhetoric. If the Opposition were serious about addressing community concerns they would have supported a move to refer the Bill to a Parliamentary Committee for Inquiry," said Jeff Angel, Director Total Environment Centre.

"An Inquiry would have been entirely appropriate, particularly given the level of community concern and lack of consultation surrounding the introduction of the Bill.

"The fact that this Bill was ultimately approved by both sides of politics is a clear indication of how little public opinion matters and how much the property industry matters to both Labor and the Coalition. But you can't win government by just pleasing the developers and there is now a big hole in the parties' community credibility," Mr Angel said."

 

See also their Position Paper on Part 3A in particular:

·  That an independent body, with members appointed by relevant groups/organisations rather than by the Minister, replace the Minister as the consent authority for the purposes of Part 3A.

·  That equal weighting and consideration be given to social, economic and the principles of ecologically sustainable development (ESD) when determining each development application. This should take into account previous decisions and cumulative impacts.

2. NSW Environmental Defenders Office - EDO Public Seminar – “Part 3A and the Public Interest” Cate Faehrmann, Nature Conservation Council of NSW - listen to speech [23:47 mins] Cr Sam Byrne, Local Government and Shires Association - listen to speech [19:20 mins] More information on the Part 3A amendments For a brief overview of the recent planning reforms, the EDO has assessed the current state of play. [PDF 92 KB]

Note the EDO July 2007 states:

“The new Part 3A reforms in 2005 introduced a new way of doing planning and development in NSW. The reforms were based on laws introduced by Premier Joh Bjelke-Petersen in Queensland in the early 1970s: the State Development and Public Works Organisation Act 1971. These rode roughshod over community consultation rights.” Jeff Smith Principal Solicitor, EDO July 2007

 

Also note:

 

EDO Paper  Part 3A Technocratic Decision-Making and the Loss of Community Participation Rights: Part 3A of the Environmental Planning and Assessment Act 1979 by Ian Ratcliff, Jessica Wood and Sue Higginson updated Feb 2007

 

Also note:

 

EDO letter Rachel Walmsley Policy Director dated 25 May 07 to Sector Strategies and Systems Innovation Department of Planning Re: State Environmental Planning Policy (Major Projects) including:

 

 

 

Additional approvals 

The consequence of the listing of a class of development as a Part 3A project under the Major Projects SEPP is that certain licences and approvals required by other Acts are no longer required. Under s75U of the Environmental Planning and Assessment Act 1979, t hese include: the concurrence of the Minister administering the Coastal Protection Act 1979, approvals under Part 4 of the Heritage Act 1977, permits under section 87 and section 90 of the National Parks and Wildlife Act 1974 and water use approvals under sections 89-91 of the Water Management Act 2000

 

These other approvals constitute important safety nets, and help ensure that all potential impacts of a development are adequately considered when the Minister makes his decision. The departments that are responsible for granting these additional approvals have the necessary expertise to adequately assess issues such as pollution, heritage and threatened species licences. The listing of a class of development under the Major Projects SEPP means that these issues may be validly ignored. Furthermore, even those approvals that still apply under Section 75U (such as an Environmental Protection Licence) cannot be refused. Given these consequences, the EDO opposes the listing of classes of development as Part 3A projects. Developments should be considered individually to determine whether they are appropriate for consideration under Part 3A.

 

Also note:

 

Environmental Defender's Office New South Wales (Ltd), Fact Sheets - 2.1.2.2. Major Projects and Critical Infrastructure, including

Environmental Assessment of Major Projects and Critical Infrastructure

 

Major Projects

The environmental assessment requirements for major projects and critical infrastructure are far more discretionary than the requirements for developments under Part 4, and activities under Part 5 of the Environmental Planning and Assessment Act 1979.

 

Once a development or activity is declared by the Minister, or identified in the Major Projects SEPP as a major project, Parts 4 and 5 of the Environmental Planning and Assessment Act 1979 no longer apply to the project, nor do the provisions of Local Environmental Plans (LEPs) or Regional Environmental Plans (REPs). Whilst the permissibility of a proposed major project in the provisions of a LEP or a REP is a matter for that the Minister must consider in determining whether to grant consent to a major project, the fact that a project is prohibited in a LEP or a REP will not necessarily prevent it from being approved. ….

 

State Environmental Planning Policies also do not apply to major projects unless the policy expressly states that it applies to the particular project. Part 3A also sets out different environmental assessment requirements for major projects

 

Unlike the provisions of Part 4 of the Environmental Planning and Assessment Act 1979 which require proponents of integrated development applications to obtain additional approvals under other legislation, such approvals are not required for major project approvals. Approved major projects are exempt from having to obtain the following approvals:

 

- concurrence of the Minister for development within the coastal zone under the Coastal Protection Act 1979.

- permits for dredging or damage to mangroves or seagrasses or to obstruct the passage of fish under the Fisheries Management Act 1994.

- approval under the Heritage Act 1977 for works affecting properties listed on the State heritage register or for excavation works which may affect relics. In addition, an interim heritage order cannot protect a heritage building, work, relic or place from being destroyed in order to carry out an approved major project.

- permits under the National Parks and Wildlife Act 1974 to interfere with or destroy Aboriginal objects.

- consent to clear native vegetation under the Native Vegetation Act 2003.

- permits to excavate the bed or shore of rivers and coastal lakes and lagoons under the Rivers and Foreshores Improvement Act 1948.

- bush fire safety authority under section 100B of the Rural Fires Act 1997.

- water-use approvals, water management approvals and activity approvals under sections 89-91 of the Water Management Act 2000.

 

In addition, the following orders and notices cannot prevent an approved critical infrastructure project from being carried out:

 

- an interim protection order under section 91A of the National Parks and Wildlife Act 1974 to protect significant areas or areas which may contain threatened fauna or flora.

- a stop work order issued under the National Parks and Wildlife Act 1974, the Threatened Species Conservation Act 1995 or the Fisheries Management Act 1994.

- an environment protection notice issued under the Protection of the Environment Operations Act 1997.

- an order made under section 124 of the Local Government Act 1993.

 

Once a major project is approved by the Minister, there is little another authority can do to prevent the project from being carried out. If an approved project requires an aquaculture permit, mining lease or environment protection licence under other legislation in order to be carried out, then another authority is not permitted to refuse that approval.

 

 

 The clear implication is that planning in NSW is under control of a modern ‘Mussolini style’ autocracy, making the DA ‘train run on time’ with hardly any democracy or justice, for instance as regards in this specific case:

-         need for future water licensing (now repealed) in a very water stressed location both for neighbours and the immediate environment due to unlicensed overuse in breach of the 1998  and 1989 consent.

-         Extreme failure to follow progressive rehabilitation requirements 1998 or 1989 consent.

-         Protection of a public land heritage lookout  on Trig Hill from extreme vandalism including destruction of sensitive vegetation and private profiteering for sand mining profits off public land.

 

DOP/Applicant misleading and deceptive conduct in publishing divergent EA summaries

 

We submit that the EA will have to be re advertised for procedural fairness to all stakeholders for the following reason: This DOP version was copied to our hard drive and printed out to evidence the very substantial confusing, deceptive and misleading variations from the CD/printed copy of the EA (which are the same) from the DOP website version as detailed in the compilation of variations in Appendix A, with printed version of the DOP website version at Appendix B

 

The summary EA is found at the DOP website as follows:

 

On exhibition - Major projects - NSW Department of Planning at

 

http://www.planning.nsw.gov.au/asp/major_projects.asp

 

viewed Saturday 26th Jan, Sunday 27th January 2008 specifically:

 

………………………….

 

·  Proposal title: Hitchcock Road Sand Quarry Project (MP 06_0104)

·  Description: PF Formation proposes to: extract up to 400,000 tonnes of raw materials a year for processing at the Central Wash Plant on Lot 198; use the existing on- and off-site quarry infrastructure; import clean material for recycling; and progressively rehabilitate the site

·  Location: To the south of Maroota - at the intersection of Old Northern Road and Wisemans Ferry Road

·  LGA: Baulkham Hills

·  Exhibition locations:
- Department of Planning, Information Centre, 23-33 Bridge Street, Sydney
- Baulkham Hills Shire Council, 129 Showground Road, Castle Hill
- Dural Branch Library, Pellitt Lane, Dural
- Nature Conservation Council, Level 2, 301 Kent Street, Sydney

·  Approval Authority: Minister for Planning

·  Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979

·  Proponent: PF Formation

·  Submission to: Director, Major Development Assessment, Department of Planning, GPO Box 39, Sydney NSW 2001

·  Start date: 5 December 2007

·  Closing date: 31 January 2008

·  Documents available: Project application, summary of the environmental assessment, Director-General's requirements for Environmental Assessment. The Environmental Assessment can be viewed online at: http://www.pfformation.com.au/__Pages/hitchcock road development news 1.htm

·  Further inquiries: Michael Young on (02) 9228 6437

……………………

 

In particular embedded URL of  summary of the environmental assessment is http://www.planning.nsw.gov.au/asp/pdf/06_0104_summary_of_the_ea_for_dop.pdf

 

Other formality and substantive irregularities in the DA/EA

 

It appears the EA has not been signed by the consultants to the DA who prepared it.

 

It is unclear who is the proponent – “PF Formation” which formerly was the trading name of Etra Pty Ltd in 1998, or another corporate entity of similar name to PF Formation such as PF Formation No.1 Pty Ltd or PF Formation No.2 Pty Ltd, or John Graham or any of these or another legal entity.

 

In the document itself at p3 1.1.2 The existing quarry there is no mention of Lot 198 in the Description of the site Table 1.1 in terms of ownership, though Lot 198 is mentioned elsewhere in the EA as the location of the washplant. This seems unduly narrow categorisation of the quarry site given the central role Lot 198 plays in the excavation. We understand that in 1998 Lot 198 was owned by Etra Pty Ltd.

 

Indeed this appears to follow a strategic approach from the 1998 litigation of attempting to exclude as much focus from the highly sensitive Lot 198 as possible given a long track record of leaks and breaches of the 1989 consent conditions, and illegal excavations.

 

In this respect we include copy of photographs of Lot 198 taken in late 1996 by this writer:

 

1996 - Maroota Lot 198 PF Formation/Etra Pty Ltd impacts Maroota Sands Swamp Forest listed as an endangered committee by the NSW Scientific Committee (at Appendix F)

 

 

 

Legal requirements for honest EA information nor  misleading/deceptive in the course of business

We note via

TRADE PRACTICES ACT 1974 - SECT 52

Misleading or deceptive conduct

             (1)  A corporation shall not, in trade or commerce, engage in conduct that is misleading or deceptive or is likely to mislead or deceive.

             (2)  Nothing in the succeeding provisions of this Division shall be taken as limiting by implication the generality of subsection (1).

Similarly we note the NSW equivalent:

FAIR TRADING ACT 1987 - SECT 42

Misleading or deceptive conduct

42 Misleading or deceptive conduct

(TPA s 52)

(1) A person shall not, in trade or commerce, engage in conduct that is misleading or deceptive or is likely to mislead or deceive.

(2) Nothing in this Part shall be taken as limiting by implication the generality of subsection

 

Our brief discussion with Jeff Smith as principal at the Environmental Defenders Office suggests that a fair trading legal complaint is potentially open to us even in a Part 3A type DA which seeks to shut down legal scrutiny. This is presumably because honest business people as much as publicly minded environmentalists want reliable and credible terms of trade in commerce and business, including information in a sandmining EA or approval process.

 

And also

 

ENVIRONMENTAL PLANNING AND ASSESSMENT REGULATION 2000 – REG 283

False or misleading statements

283 False or misleading statements

A person is guilty of an offence if the person makes any statement, knowing it to be false [bold added] or misleading in an important respect, in or in connection with any document lodged with the Director-General or a consent authority or certifying authority for the purposes of the Act or this Regulation.

 

We note the subjective knowledge test is absent in the fair trading legislation, and that it is presumably an objective test whether the market has been misled.

It seems to us that either knowing or unknowing supply of misleading or deceptive information in one or other of the EA summaries, or in the EA proper is in breach of these fair trading provisions in the course of business, trade & commerce, at NSW and/or the federal version of this law. We are taking further legal advice on this. We note the EA summary error above but also other misleading and deceptive information below.

 

Litigation history – 1998 case law

In 1998 a similar DA made to BHSC was challenged in the Land & Environment Court in Diamond v BHSC and John Graham (PF Formation/Etra Pty Ltd No. 10061/1998) and much tougher conditions of consent were legally negotiated by way of settlement of the legal dispute with all parties paying their own very substantial legal costs. These conditions of consent were “without prejudice” by either side. In other words the challenge was so meritorious that presumably BHSC counsel felt no costs order was reasonably  possible by BHSC, nor did JG for the challenge to the BHSC consent because there were such substantial changes in the negotiated conditions outcome.

This is quite contrary to the spin in the EA stating blandly the appeal was “dismissed”

A third party filed a Class 1 Appeal against the consent in March 1998. This was heard in the Land and Environment Court in July 1998 and the appeal dismissed.

 

[at page 16 - all references to the EA summary are to the printed/CD version]

 

This was the legal formality.  In reality it was a tough negotiation probably unduly generous to the sand miner given Diamond’s financial limitations in gathering more damning expert evidence, with Brian Preston as counsel representing BHSC who literally wrote the book on “Environmental Litigation” (1989) and is now Chief Justice of the Court. Bruce Woolf represented Neville Diamond and the co author of this submission Tom McLoughlin was assisting pro bono paralegal via green group Friends of the Earth Sydney Inc in 1998.

 

‘Key approval conditions’ go way beyond the spin bottom of p16 to 17 of the EA summary. We include a full copy of the consent conditions with this submission:

 

Rather than “sterilise” volume of tertiary sand, it protected a local heritage land mark and scenic lookout on public land, and also with endangered community of shale sandstone transition forest listed on the NSW Scientific Committee.

 

 

A full copy of the consent conditions as agreed (including handwritten notations in the court precinct in 1998) are enclosed at Appendix C particularly relevant to the conditions of progressive rehabilitation which we believe the current sand mine is in wanton breach of since 1998, and breach of from the previous consent in 1989 before that. In other words we see no reason to trust this sandminer on compliance of DA conditions 10 years later or in the future.

 

The EA summary bravely claims:

 

The extraction has subsequently been operated in compliance with Consent Orders 10064 of 1998 of the Land and Environment Court dated 14 July 1998. [p16]

 

 

The site is operated in compliance with these and other conditions included in the

consent orders administered by Baulkham Hills Shire Council. [p17]

 

We will demonstrate that this repeated claim of compliance is false and misleading, and may well be knowingly (hence omission of the full consent conditions of 1998 from the EA?), not least lack of rehabilitation and failure to license water usage.

 

In this respect we refer to this community media report of the current sand mine with recent photographic evidence at Appendix D, also at Sydney Alternative Media 15th January 2008 (community news service with 18,000 page views per month):

 

Tuesday, 15 January 2008

Sandminer in bid to avoid rehabilitation legal rules at Maroota, 45km from Sydney?

 

We discuss further below another blatant breach on and around this site pre 1998 being the 1995 infamous ‘road to nowhere’ involving 3 years of illegal sand mining, to a depth of 30m for a road approval at 4.5m, a breach effectively sanitised by the 1998 DA BHSC proposed approval partly amended by Diamond in the Land & Environment Court in 1998.

 

Balanced approach of objection to Dixon Sands (Penrith) Pty Ltd  (“DS”) environmental impacts in Maroota

 

In terms of balance regarding other sandminers Neville Diamond (“ND”) advises: 

 

The Extractive Industry Report of BHSC/Officer Peter Zadeian (“PZ”) was challenged by DS in the Supreme Court around 1999, and the result apart from local political controversy was that the court declined to prevent the EIR from going forward for the information of councillors. DS argued the EIR was seriously flawed. DS was closed down on the strength of the EIR by PZ.

 

In terms of even handed approach ND did legally challenge then Dept of Infrastructure & Natural Resources (DIPNR) approval of  DS 2003 application (Lot 196 expansion) on the basis (inter alia) of unlicensed water use.

 

We understand DS obtained a consent in 2004 for Lot 196 and Lot 1 and Lot 2, and Dixon got another consent soon after in Sept 05.

 

Re DS approval Haerses Rd Sand Quarry early 2006 (major development). ND did not challenge this approval due to other pressing business namely court challenge of Birdon Contracting P/L (owner Tom Bruce) at Tinda Creek in 2006 due to (inter alia) unlicensed use of water.

 

The history of ND work with and for DS in litigation against PF Formation can be found at Appendix M .

 

 

Excessive water usage contrary to Ecologically Sustainable Development principles

 

We understand that despite the dictatorial nature of the Part 3A regime gutting the EPA Act the minister is still bound to consider principles of ecologically sustainable development as per the Anvil Hill and Sandon Point cases of the last year. Similarly we note SREP 9 paragraph 4 Ecologically Sustainable Development. Water usage has been highly controversial at Maroota at least since 1996, that is otherwise higher rainfall periods which itself suggests some very excessive impacts on neighbours to sandmining, especially as regards high clay content areas like Trig Hill Area and Lot 198.

 

See for instance this govt brochure:

 

marootagroundwaterstudy96.jpg

We also note the Director of DOP criteria for the EA inclusion of "The NSW Groundwater Dependent Ecosystems Policy" DLWC 2002, with reference especially to Management Principles at pages 21 -25 found via PDF file here:

 

In summary here:

 

 

grwaterdependecosyst5principles2002dlwc.jpg

 

We are concerned that the five principles there have not been fully addressed and resolved in the EA.

 

 

We also refer to

 

  1. Max Taylor/Toomakoo Pty Ltd letter to BHSC 27 October 1988 attaching extract of Geological Survey of NSW DMR “Geological investigation and resource assessment of the Maroota Tertiary Aluvial Deposit by L..T. Etheridge” at Appendix C1
  2. David Taylor BSC Agri (soil Sc,, MBA, Ad Cert Man, Manager Hawkesbury Technologies Ltd, expert evidence report June 1998 in Diamond v BHSC/Graham/Etra Pty Ltd/PF Formation,  at Appendix C2

In relation to ESD as it applies to water resources we submit there has been a long history of unlicensed and excessive water usage by PF Formations and no doubt other sand miners in Maroota:

 

DS, and PF both have dams never licensed under the Water Act 1912 or Water Management Act 2000 and there are probably other dams by other miners similary not licensed. Specifically illegal water use during the watch of Peter Zadeian (PZ) up to 2001 and Christine McKenzie post 2001 at BHSC involved a small window created by PF Formations into the water table on the Trig Hill Area (“THA”) about 1995-6. This was then expanded to the present far larger window which is  now used as a dam capturing all the surface water from THA - 7 parcels of land mostly owned by PF. The dam on 167 has never been licensed under the Water Act 1912 or Water Management Act 2000.

 

ERM McCotter Report (produced for ND in the 1998 litigation Diamond V BHSC & Etra Pty Ltd t/a PF Formations 10064 of 1998) over the same THA extraction operation states that PF were using an estimated 332 megalitres -  when in fact at that time in 1998 they were only licensed for 50 megs. In actual fact under DLWC license that 50 megs was to be shared by 4 different users inclusive of PF  and neighbours Toomakoo P/L lemon farmers, Black market gardener, and Roberts market gardeners.  Extracts of the ERM report follow and a full copy is at Appendix C3

 

ermno1extractch6.jpg

 

The Sullivan Report of 1998: This unlicensed water usage raises the question where is PF sourcing it, and what impact was it having on the other 3 neighbours already forced to share the 50 megalitres.  ND advises they were all under duress over water because PF well prior to 1998 had already mined out of area and breached the water table on THA affecting the recharge of the aquifer which fed the springs to Toomakoo/Taylor, Roberts and Black land. ND submits the DLWC granted the 50 megalitre shared license on or about 1995 as a compromise resolution of that breach of the aquifer and the failure of the DLWC to alert BHSC of the impact on water supply of the 1989 consent for THA to PF. The background detail to the damage to the aquifer is in the expert evidence in a report for ND in 1998 litigation by Sullivan Environmental Consulting which unfortunately was too late to be considered by the court in 98 but was filed in the court and provided to PZ and BHSC and PF Formation. For instance see extract attached at Appendix C4.  

 

For instance Sullivan reports at page 3 that

 

“The Woolley 1980 letter acknowledges Mr Tayler’s concern that the proposed removal of sand deposits would adversely affect the supply of water from the spring and states that “mining along his eastern boundary would probably reduce the flow from the spring by more than 50% because it would eliminate the flow of groundwater from the main recharge area.

 

The [Woolley] letter advises that “the proposal to extract sand and gravel from the Maroota deposit will have an affect on the groundwater resources of the area in that it will remove most of the material which now both facilitates recharge from rainfall to the groundwater system in the area and provides storage for this water.”

 

The letter to Baulkham Hills Council concludes that “It is regretted that the groundwater situation was overlooked when the Commission commented previously on the mining proposal.”

 

In 1980 Mr Woolley was a senior hydrogeologist with the Water Resources Commission and I understand that he is presently in a similar position with the Department of Land and Water Conservation (DLWC)

 

We understand this to mean that Woolley substantially agrees with Taylor as far back as 1980 about significant or even 50% reduction in flow of spring water that Taylor depends on at his place to the west of extraction of sand deposits on THA. (Woolley is held in very high regard as an expert for instance the NSW Government appointed him to do in 2006 an expert’s “Peer Review of Technical Reports” for Sydney Catchment Authority, Avon Nepean areas).  This view of Woolley is supported by Ethridge in 1980 (see extract attached in Appendix C1):

 

“Extraction of sand below the water table in the area near Hitchcock s Road would effectively cut off groundwater flow from the main intake area to the Haerses Road area.”

 

Sullivan, a very experienced expert in his report of June 1998 just out of time for the litigation by ND, further evidences this predicted eventuality of damaged water resource foreseen by Woolley and Ethridge back in 1980. Sullivan states:

 

“[at p 3] The report on Mr Taylor’s spring comprises a letter from Woodward-Clyde (signed by Dr Carosene) to PF Formations dated 3 April 1995 which was prepared following the publication of an article in a local newspaper.

 

I am advised by Mr Taylor that the yield values for the spring used in Dr Carosene’s evaluation are incorrect to a major degree. Rather than an original daily yield of 7000L the actual flow rate measured  by Mr Taylor for April 1980 was 388,000L/day and the flow rate measured in March 1995 was 52,300L/day rather than the 2000 to 3000L/day indicated in the background section of the letter. The spring flow is understood to have remained at this lower level to the present time.

 

The site observations section appears to generally agree well with my observations during my January/February 1995 inspection. It is noted that the elevation of mining at this time was about RL 180m, which is significantly lower than the RL 187m, regularly referred to in the documentation relating to the proposal for additional mining, as the lower limit of mining. Although the area of ponded water was about 15m in diameter my recollection was that the surrounding area, (about 3 ha) mainly to the north and east was only a little higher (say RL 181-182m) and much of the area appeared wet.

 

My recollection of the descriptionof Mr Taylor’s spring concurs with that of Dr Carosene’s except however that the yield at that time (early 1995) would have been about 40-50% of the

storage volume available. …..

 

I have combined the information provided in the earlier report by Etheridge with the information provided in Figure 2 of the April 1995 letter report to produce the attached Appendix B. The marked up cross section sections shown in this Appendix provide my assessment of the most likely ‘before mining’ groundwater flow regime for comparison with an ‘after mining’ flow regime.

 

sullivanexpreportdiagram.jpg

 

As indicated by this figure the flow into the spring is considered most likely to have been significantly reduced from the 388kL/day flow rate measured in 1980 to the 52kL/day measured in 1995. The reasons for the reduced flow are considered to be as follows:

 

·        removal of some 137kL/day (50ML/year) under licence by the mining activity, resulting in a much lower flow from the perimeter of the sand aquifer;

·        evaporation of some 30kL/day from an area of about 3 ha (which has a very shallow water table) based on a net evaporation rate of 1 mm/day;

·        a reduced head of groundwater in the Maroota sands which will result in a significant reduction in the flow through the underlying sandstone.

 

I strongly disagree with Dr Carosene’s conclusion that he considers it highly unlikely that the Tayler spring has been affected by the sand mining operations. On the contrary I consider that the information available clearly indicates that the significant reduction in yield of the Taylor spring is most likely to be a direct result of the sand mining activities on Lot 167.”

 

We submit that this expert evidence  from Sullivan confirms very great impact on the water resource by sandmining at the THA up until June 1998. We submit logically that such impact can only be greater by sandmining by Graham/PF Formation up until 2008 in the same general location, or at any time beyond.

 

Of interest is that ND allegation that a bureaucrat running the Maroota Groundwater Study, Dan McKibbon (DIPNR/DWE) “lost” a year’s pumping figures from the DIPNR monitoring bores which apparently confirmed the sandmining at Maroota precinct including THA caused significant reduction in the water table. We find this losing of critical data very curious and suspicious and strengthens our view the current proposal should go to a credible expert inquiry. We understand Mr McKibbon is a consultant with Parsons Brinckerhoff for the EA for PF Formation in the current DA before the DOP.

 

ND alleges that neither of these reputable and highly professional reports by Sullivan or ERM McCotter or the implications of them have ever been provided to the elected councillors of BHSC despite the opportunity. Further the BHSC have not provided this information to the Dept of Planning for the current DA which is virtually the same are3a as the 1998 DA which was limited to some degree by the legal settlement conditions of the litigants before L&E Court with each party paying their own costs.

 

The socio-economic effects at p28 of the print CD EA, completely omits the significance of excessive water usage on all other neighbouring water users as per the Sullivan and ERM McCotter Reports in the 1998 litigation.

 

We note the past history back to the 1990ies of illegal pumps at Maroota indicated here by a gold star from past inspections by ND:

 

illegalpumplocationsmaroota.jpg

 

We remain concerned that the EA does not contain a water balance or water management plan and when combined with the history of illegal pumps as shown above we submit this is a recipe for massive over exploitation of the local water resources.

 

 

 

 

Is it really a  “major project” or simply an attempt to avoid 1998 Land & Environmennt Court rehabilitation settlement conditions? Evidence of avoidance of s.94 contributions

 

We note the criteria for major project status here:

STATE ENVIRONMENTAL PLANNING POLICY (MAJOR PROJECTS) 2005 - SCHEDULE 1

SCHEDULE 1 – Part 3A projects-classes of development

(Clause 6)

7 Extractive Industries

(1) Development for the purpose of extractive industry that:

(a) extracts more than 200,000 tonnes of extractive materials per year, or

(b) extracts from a total resource (the subject of the development application (or other relevant application under the Act)) of more than 5 million tonnes, or

 

 

We question whether in fact the development will generate more than 200K tonnes p.a. or more than 5 million tonnes given the high clay content of the Trig Hill. The EA Summary does not name a figure for the volumes per annum possibly because they cannot evidence such volumes either above or below 200K pa without running into trouble on accounting for s.94 contributions?

 

The explanation for this as we understand is that there has never been a quantity survey of sand mining in this area by PF Formations (or other sand miners in Maroota to our knowledge), nor is this adequately addressed by survey measurements alone or alternative accounting by weigh bridge which is susceptible to compromise and cheating: We provide pictorial evidence of avoidance of the PF Formation weigh bridge below taken about 1998 with the Dixon signage showing illegal exit from PF Formation site in north west Maroota in the opposite direction to the weighbridge at Lot 198 and legal exit way:

 

Significantly ND alleges that he, David Dixon and David Dixon’s driver in about 1998 tracked approximately 100 tonne of sand being delivered from the northern most PF extraction site in Maroota by way of avoidance of the weighbridge with delivery some 5 km away to the Camelleri property (named as an associated land owner in this proposal p3 Table 1.1). This and other pictures were taken at the time as evidence:

pf1998aavoidsweighbridges94contributions.jpg 

 

 

In other words we submit there is a culture of avoidance of the weighbridge and no accurate credible volumetric auditing of extraction volumes. We understand in the early 90ies that BHSC, in response to public complaints about integrity of s.94 accounting that the council retained an auditor from Truman & Associates to study this question of volumetric measurement of the extractive industry in order to accurately account for s.94 developer contributions. We understand that ‘audit’ was woefully inadequate and unconvincing and treated with little credibility by most stakeholders. Apparently its inadequacy was kept secret for up to five years by BHSC by refusing to release the report.

 

 

History of bad faith by John Graham/PF Formation in relation to Lot 167

 

- the internal haulage road that became a massive sand mine in breach of 1995 approval on this site?

 

Neville Diamond advises the DA 95/189 of 1995 to BHSC construction of a private access road for later use of an internal haul road system on lot 167, DP75209, Lot 198 and Lot 1 and 2 on DP 570966, which was approval for a 4.5 metre depth and 13 metres wide (refer figure following) was then constructed in breach of the DA to 30 metres deep and 100 – 200 metres wide. This was a controversy in the local  press at the time: “An accusation over excavation” 1998 Hills District Times with local resident James Gouskos estimating 300,000 tonnes of sandy material from what was meant to be a 4m road construction: As per these images taken in 1998

road30mdeep98trigha.jpg

hillsshiretimes97or8.jpg

roadtonowhere4mto30mdepth.jpg

What was the BHSC role in the ‘road to nowhere’ breach of the DA depth and width conditions which facilitated the illegal excavation of the area around the THA 26m deeper than the approved 4.5 m depth?

 

Diamond alleges that council officer Zadeian misled the local press, the councillors in the relevant Extractive Industries Report and later Justice Lloyd in the Land & Environment Court and  solicitors for BHSC (possibly through another council officer Michael Watt) by ignoring the breach of depth limit and hiding behind a letter of a  geotechnical expert for PF dated 21 Dec 1995 (Appendix E) about road specifications and clay base which never intended to, nor could of itself, authorise as an expert adviser to PF Formation a 26m deep, 100m plus wide exceedance of the internal road consent conditions. The massive volume excavated on the flimsy basis of a road may not have been subject to full s.94 development contributions for export of sand. It seems to us in light of the photographs above of truck avoiding the weighbridge above the company willing to exceed the road depth by 26 m would have little problem driving around the weigh bridge to defraud the public revenue of s.94 contributions as well.

 

ND advises he and David Dixon and Dixon’s driver tracked fully laden PF Formation sand trucks exiting via an unauthorised side road starting lot 1 then public road right next to lot117 (this is the Dixon access road off limits to PF Formation). This was in 1998. Diamond calculates 100 tonne to Camelliri Place 5km  away via this avoidance method.

 

 

- illegal operation of Lot 198 through out the 1990ies?

 

Refer to our photographic evidence at Appendix F in relation to the endangered community of Maroota Sands Swamp Forest as listed by the NSW Scientific Committee, and correspondence of 17th April 1998 to BHSC at Appendix H for more general concerns of cowboy operations of the Maroota sand extraction sector as per a lengthy submission regarding failures of BHSC to maintain effective regulation of the sector.

 

 

 

- vandalism evidence in 2000 of the Shale Sandstone Transition Forest on Trig Hill public reserve post Land & Environment Court decision 1998

 

Refer Appendix G for photographic evidence in 2000 taken by Tom McLoughlin of vandalism of the SSTF on the Trig Hill site, and refer to this listing of the NSW Scientific Committee.

 

atrigresveg2000postlecdecisionvandalism.jpg

 

Further images of the quite good quality and aesthetically appealing apex of Trig Hill SSTF forest taken by this writer in January 2008 can be found at Appendix J.

 

pinkwildflowerssandsswampforest.jpg

 

- disturbing grant by the Dept of Lands officer of public heritage lookout Trig Hill to private lease of PF Formation sandminer in defiance of the terms of  Land & Environment Court 1998 decision

 

The legal settlement condition of 1998 to Graham/Etra Pty/PF Formation states:

 

3.7 Public Access to Maroota Trignonometrical Reserve:

 

Public access to the Maroota Trigonometrical Reserve shall be provided and maintained via existing Crown Reserve Roads to the requirements of Council and the Department of Land Water Conservation and details of which are to be submitted to Council.

 

There seems to be a pall of mystery over how a private lease was granted over the THA by the stroke of a pen of a Lands Dept officer, when even BHSC as far back as 1998 had itself been determined to exclude this area from the sandmining operations not least because it was established as an important cultural site for the local community. This is made very clear in the BHSC report of Peter Zadeian dated 12 December 1997 as per the extract of section 3.2 at Appendix K

 

Was the lease on a proper basis? Did the lease terms have payment of rent, payment of future sand mining royalties? Why has the public lost access to its historical/heritage scenic lookout to view the whole surrounding district (and likely was the use by colonial settlers and Indigenous before that). Local historian Geof Bucchan held cultural events in the 90ies when it was still public access. 

 

ND alleges that his FoI inspections of the Lands Dept files indicated a serious argument between Lands Dept officers over the lease grant with the officer (George Forster?) stating in effect ‘there was nothing on it’ and another referring to in fact there being forest (indeed forest listed by the NSW Scientific Committee). If true, this is a scandalous turn of events suggesting the excessive influence of the sandminer to subvert regulation in the district, with the assistance of what we imagine to be an ignorant, negligent Lands Officer or worse.

 

In the current proposal in the EA Summary under Cultural Heritage p26-27 the alleged lack of cultural heritage of the Trig Station is tritely asserted and does not resolve the heritage significance of the scenic lookout, landscape and aesthetics.

 

 

-         comprehensive failure of progressive rehabilitation of land by PF Formation/Graham for 20 years

dogthasept98slurrynorehab.jpg

nevillediamond1998rescuedogdangertha.jpg

 

Picture: Trig Hill Area 30m deep ‘road’ slurry, tame pet dog rescued purely by chance from dangerous quicksand stuck fast on community inspection day, Sept 1998.

 

Print/CD version of EA Summary at p21 roman numbers reads:

 

Sand has been extracted from part of the site to the depth allowed

in the existing consent and part of this area has been rehabilitated.

 

In fact we understand there has been little or no progressive rehabilitation contrary to the terms of the 1998 settlement terms of consent and timetable and very little prospect of any compliance. Indeed the feeling is that the relevant company will be wound up and avoid any rehab cost in decades to come depending on how long it can obtain unquestioning approvals. All experience directly contradicts page 22 of the EA Summary:

 

The majority of the site to be quarried would be rehabilitated with grasses on the flatter slopes and local native plants on the batters and steeper slopes.

 

Indeed this photo immediately below from the Lands Dept from a aerial survey map photo (THA at bottom left and Lot 198 at top right) 1st October 1998, cost $400,  indicates the extensive sand mining 10 years ago with no rehabilitation since 1989 works commenced. When this photo is compared to the site images in the EA of Dec 2007 one can see there has been practically no ‘progressive rehabilitation’ whatsoever.

 

pfminingl167l198deptlandsmaroota1oct98.jpg

Pictures: Above is Lands Dept photo 1/10/98 Lot 167 Trig Hill area, below is EA Summary Dec 2007 evidencing little or no rehabilitation for 10-20 years of PF Formation sandmining.

.

pfl167trighillsitenorehabdec07easumflfaunatechpaper.jpg

 

For an overall image of the whole Maroota Sand mining district go to Appendix L. taken by the Lands Dept 1st Oct 1998.

 

The rehabilitation bond is grossly inadequate. In the previous consents given by BHSC the bond was $2 per square metre. In recent DA approvals as we understand it’s gone up to $3sqm. Currently we understand there is $200K in the BHSC rehabilitation bond lodged by PF Formation for all their operations at Maroota under BHSC. In theory if this current DA was rejected by the DOP we submit this is a hopelessly inadequate amount to pay for rehabilitation of the Trig Hill consent area of ’98 including protection of existing vegetation.

 

 

Dust impacts on local area

 

In relation to dust wind comes sweeping up the plain such that cars get sandblasted. This material can cause dust silicosis over time. We submit the advice of the air quality consultant in the EA is unsafe and unreliable concerning this excessive dust coming from the west hitting the school and orchards:

 

We understand excess levels contrary EPA guidelines affect the  school – refer PF Formation Annual Reports dust monitoring for around 2001-03. Dust meters are not locked and can be tampered with easily enough, pretty obsolete technology when observed by ND in 2002.

 

Refer page 113 of the EA involving averages over a month which hardly addresses particular days of prevailing westerly winds with much higher intensity:

 

One of the monitoring sites (Maroota Public School) is approximately 1,200 metres to the north, closer to other sand mining operations while the other two are on the boundary of the current operations but within the Hitchcock Road site itself. Maximum annual average dust deposition rates are above the criterion of 4 g/m2/month at all these locations, ranging from 4.4 g/m2/month to 4.9 g/m2/month.

 

 

 

Failures of regulatory governance of the sand extractive industries in the Maroota District

 

The failure of local and state government local department)s) to strongly administer the cowboy sandmining industry at Maroota means that the sand is being sold artificially too cheap as low as $15 a tonne, delivered. This means there is no financial component in the price for rehabilitation externalising the impact to the future and probably the public purse, if ever.

 

We understand that statewide the Dept of Water Annual Report 2005-2007, 2006-7 p28 reports no prosecutions statewide for breaches of the Water Act 1912 in either year, only 2 penalties for the Water Management Act 2000 in 05-06, none in 06-07, and only 1 prosecution under the Rivers & Foreshores Improvement Act 1948. These low figures of enforcement are derisory compared with 90,000 ground water bores and 13 900 surface water licences according to the 06-07 Annual Report.

 

 

Maps for PF Formation in the EA evidence virtually no rehab on THA or Lot 198  site contrary to best practice.

 

DS EISs have pictures of massive exposed areas contrary to best practise.

 

DS were shut down by BHSC in 1999 for bypassing their approved staging plan.

 

PF did exactly the same thing on the original consent in the late 80ies on Lot 198 but BHSC took no action for reasons only known to officer Peter Zadeian (who was later asked to resign for running a consultancy from council offices). Zadeian went on to work as a consultant for McCartney who opposed the new consent for DS in 2002/3 , main competitor to PF (Qui bono? – PF Formation).

 

Diamond alleges PZ fabricated council reports re PF from 95-2001 (at which time he was asked to resign for misuse of BHSC facilities for private consultancy work which may or may not have been related to sand mining). ND says he can prove fabrications/errors/deceptions/mistakes in council reports. These proofs re PZ are said to be in 3 main areas:

 

1. Firstly On portion 167 (part Trig Hill consent – 1989) PF extracted out of area, from ‘89 to ‘98 according to ND reading of maps, personal observations and complaints to BHSC. For instance an extracted area known as ‘zucchini patch’ (as called by the residents) ND states as out of area (says boundary verified by the maps). This is rehabilitated mined area complimented by PZ in his extractive industry reports while ignoring that it is also out of area and illegal (PZ Extractive Industry Report 16 June 1998 bottom page 22).

 

Extractive Industries Reports (“EIR”) are done every 6 months for the whole Maroota mining precinct 1996-present. The EIRs under PZ oversight 96-01 were 20-30 pages long, reasonably detailed albeit allegedly corrupt/incorrect in places. These EIR were so controversial DS challenged them in the NSW Supreme Court in 1999 as inaccurate but the judge preferred to leave that to the political process of lobbying, even if inaccurate.

 

2.Secondly, ND alleges PZ has completely ignored in both

 

-         his report for approval of the 1998 DA on the Trig Hill mining site by PF; and

-          in subsequent EIRs on mining in the Trig Hill area

 

the expert evidence he and the council were provided with at the relevant times also discussed above:

 

A.     ERM McCotter Report produced for ND in June 1998 litigation Diamond V BHSC & Etra Pty Ltd t/a PF Formations 10064 of 1998,

 

B.     The Sullivan Report of 1998.

 

ND advises that neither of these reputable and highly professional reports or the implications of them have been provided to the elected councillors of BHSC. Further the BHSC have not provided this information to the Dept of Planning for the current DA which is virtually the same study area as the 1998 DA which was limited to some degree by the conditions agreed by settlement of the litigants before the Land & Environment Court with each party paying their own costs.

 

3. Thirdly ND alleges a critical Williams geotech advice letter (at Appendix E) on a shallow internal haulage road was selectively quoted in PZ’s EIR, and PZ effectively misled/allegedly perjured (?) himself in evidence to Justice Lloyd in proceedings by BHSC v DS in 1999  (according to evidence on the stand in transcript of PZ evidence under cross examination, around page 67 of that case, copies provided to DPNIR by ND).

 

ND alleges that these complaints were never properly investigated or resolved.

 

 

After 2001 EIRs were done by BHSC officer Christine McKenzie in a greatly different style – only about 9 pages long, ¼ page per mine. ND alleges these sanitised true situation re failure of enforcement of consent conditions omitted from the  reports eg

-         Deceptively omits lack of rehabilitation

-         Lack of water licensing (legally required for each quarry prior to works commencing) and/or licenses insufficient for volumes used; PF and DS lacked licensing for pump from clean water pond to wash plant, (as distinct from the license for the bore to the deep aquifer that tops up the clean water pond);

 

 

State govt departmental governance of water issues has also been problematic around

        licensing,

        failure of Sydney South Coast regulatory section

        unresponsive complaints system,

        misleading the minister

        failure of DLWC/Maroota Ground Water Study objectives

        failure of SREP9 eg to provide a steady supply of sand following ESD, with no future plan

        abolition of the Maroota Environmental Impact Consultation Committee (aka MEICC aka meek and mild committee!) later known as the MQCC (Maroota Quarry Consultation Committee) by State Planning (ie DIPNR)

 

ND’s advises his role in litigation funded by and for Dixon Sands is attached at Appendix M.

 

We understand two officers have been put forward as compliance officers for the DOP to monitor DOP consents of sandmining at Maroota. One of these officers is ex EPA and was in charge of all the previous monitoring under the BHSC consents. In the last 20 years we believe the EPA have not taken any meaningful action to enforce what environmental regulation. In particular we refer to the pitiful lack of concern by the EPA at the threatened smothering of now listed endangered ecological community (NSW Scientific Committee) adjacent to Lot 198 in 1996 as set out in the materials at Appendix N.

 

 

 

………………….

 

Appendix index

 

 

A. Compilation of variations of DOP website version of EA Summary versus printed EA/CD version,  by solicitor Tom McLoughlin

 

B. Deceptive DOP website version of EA Summary advertised December 2007, January 2008

 

C. A full copy of the negotiated legal settlement conditions as agreed “without prejudice” (including handwritten notations in the court precinct in 1998) in Diamond v BHSC and John Graham (PF Formation/Etra Pty Ltd No. 10061/1998), no costs ordered against plaintiff Neville Diamond.

 

C1. 27 Oct 1988 - Max Taylor/Toomakoo Pty Ltd objection to sand mining Lot 167 Trig Hill area, Maroota

 

C2. David Taylor expert report “Maroota Trig Station Development Application, Diamond V Baulkham Hill Shire Council and Other, June 1998.

 

C3. June 1998 - ERM McCotter expert report PF Formation sandmining Maroota Trig Hill Area, Lot 198

 

C4. 14 June 1998 Sullivan Environmental Consulting expert evidence on water consumption by FP Formation

 

D. SydneyAlternativeMedia:  Tuesday, 15 January 2008 article, photo gallery re ‘Sandminer in bid to avoid rehabilitation legal rules at Maroota, 45km from Sydney?’

 

E. Ralph Williams Consulting Engineers Pty Ltd 21 Dec 1995 re internal haulage road specifications

 

F. 1996 - Maroota Lot 198 PF Formation/Etra Pty Ltd impacts Maroota Sands Swamp Forest

 

G. Photographic evidence in 2000 taken by Tom McLoughlin of vandalism of the Shale Sandstone Transition Forest on the publicly owned Trig Hill site

 

H. 17 April 1998 – Submission to Baulkham Hills Shire Council re alleged illegal operations, environmental damage by sand mining at Maroota

 

J. Jan 2008 - Maroota Trig Hill Shale Sandstone Transition Forest

 

K. 12 Dec 1997 -Baulkham Hills SC retention Trig Hill cultural, scenic, landscape significance

 

L. Lands Dept photo 1/10/98 Lot 167 Trig Hill area, comparing EA Summary Dec 2007 technical paper image, evidencing little or no rehabilitation for 10-20 years of PF Formation sandmining.

 

M. 1997-2008 - litigation history of Neville Diamond 'for Dixon Sands (Penrith) Pty Ltd'

 

N. 1996 EPA unresponsive to threat of dam failures at Maroota from heavy rain

 

Appendix D
 
 
Tuesday, 15 January 2008
Sandminer in bid to avoid rehabilitation legal rules at Maroota, 45km from Sydney?
Mood:  irritated
Topic: ecology

 

 

 

 

 

 

 

 



These images are taken from a big sand mining operation 45km north of Sydney at Maroota corner of Wiseman's Ferry Rd and Old Northern Rd on a tourist drive there, 12th Jan 2008. There is no attribution of the photographs.

It's next to a private residence, 1 km from the local school, across the road from an orchard and about to destroy a lookout on a Trigonometrical Reserve on public land, and officially endangered

"Maroota Sands Swamp Forest ... at risk from hydrological changes from nearby extractive industries": NSW Scientific Committee Final Determination gazettal 17/10/97.

The saga of broken legal obligations under consent conditions agreed (no costs order) adopted by the Land & Environment Court in 1998 are very disturbing, not least the blatant failure to rehabilitate according to a timetable and schedule over the last 7 years.

Now the company PF Formations effectively wants to further avoid these land rehabilitation legal obligations (in the "schedule marked A" as referred to below) with a huge water hungry "State significant" expansion of their sand mine at Maroota which will effectively make the rehab of the public's Trig Reserve redundant. Because the lookout will no longer exist except as a hole in the ground!

 

Enter supporting content here